Overblog
Suivre ce blog Administration + Créer mon blog
Le blog de fukushima-is-still-news

Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

Les articles avec le tag : daiichi nuclear plant

05/06/2014 Publié depuis Overblog

ALPS far from perfect solution

June 5, 2014 Problems still plague ALPS decontamination system at Fukushima plant http://ajw.asahi.com/article/0311disaster/fukushima/AJ201406050041...

En savoir plus

05/06/2014 Publié depuis Overblog

Contaminated water leaking outside barriers

June 4, 2014 TEPCO: Tainted water may have leaked from barriers http://www3.nhk.or.jp/nhkworld/english/news/20140604_41.html...

En savoir plus

03/06/2014 Publié depuis Overblog

Numerous hazards of frozen wall

June 3, 2014 Ground broken for frozen soil wall at Fukushima nuclear plant http://ajw.asahi.com/article/0311disaster/fukushima/AJ201406030043...

En savoir plus

03/06/2014 Publié depuis Overblog

Ice wall construction started

June 3, 2014 Construction work for ice wall begins at Fukushima plant http://mainichi.jp/english/english/newsselect/news/20140603p2g00m0dm039000c.html...

En savoir plus

31/05/2014 Publié depuis Overblog

Very high radiation in suppression chamber of No.1 reactor

May 31, 2014 Probe detects high radiation at Fukushima reactor http://www3.nhk.or.jp/nhkworld/english/news/20140531_13.html...

En savoir plus

31/05/2014 Publié depuis Overblog

Building of frozen wall to start on Monday (June 2)

May 30, 2014 Frozen wall set to be built at Fukushima Daiichi http://www3.nhk.or.jp/nhkworld/english/news/20140530_33.html...

En savoir plus

29/05/2014 Publié depuis Overblog

Frozen wall approved by NRA

May 26, 2014 NRA to approve frozen wall work at Fukushima plant http://www3.nhk.or.jp/nhkworld/english/news/20140526_23.html...

En savoir plus

29/05/2014 Publié depuis Overblog

TEPCO explains leak at number 1 reactor

May 28, 2014 Tepco pinpoints leak at Fukushima No. 1 reactor Kyodo The operator of the crippled Fukushima No. 1...

En savoir plus

28/05/2014 Publié depuis Overblog

Tritium over the limit but water dumped nevertheless?

May 28, 2014 Tritium levels at Fukushima No. 1 top Pacific Ocean dumping limit, Tepco admits http://www.japantimes.co.jp/news/2014/05/28/national/tritium-in-fukushima-groundwater-tops-limit-for-discharge-into-sea/#.U4ZHayji91s...

En savoir plus

25/05/2014 Publié depuis Overblog

ALPS line B restarted (2)

May 24, 2014 TEPCO restarts ALPS water-decontamination system at Fukushima plant THE ASAHI SHIMBUN http://ajw.asahi.com/article/0311disaster/fukushima/AJ201405240043...

En savoir plus

24/05/2014 Publié depuis Overblog

Partial restart of ALPS (line B)

May 23, 2014 TEPCO partially restarts water treatment system http://www3.nhk.or.jp/nhkworld/english/news/20140523_30.html...

En savoir plus

21/05/2014 Publié depuis Overblog

Groundwater released into sea (follow-up)

May 21, 2014 TEPCO begins releasing groundwater diverted at Fukushima plant into sea http://ajw.asahi.com/article/0311disaster/fukushima/AJ201405210035...

En savoir plus

21/05/2014 Publié depuis Overblog

ALPS system shut down completely (2)

Glitch-prone ALPS water treatment equipment shut down at Fukushima plant http://ajw.asahi.com/article/0311disaster/fukushima/AJ201405210026...

En savoir plus

21/05/2014 Publié depuis Overblog

Bypass plan: Starting today

May 21, 2014 Groundwater release begins at Fukushima Daiichi http://www3.nhk.or.jp/nhkworld/english/news/20140521_19.html...

En savoir plus

21/05/2014 Publié depuis Overblog

TEPCO to start releasing pumped water into sea

May 20, 2014 Groundwater release to begin at Fukushima Daiichi http://www3.nhk.or.jp/nhkworld/english/news/20140520_38.html...

En savoir plus